Assembly and installation of the pressure part under the construction of the new 858 MW power unit at the Bełchatów Power Plant: |
|
Additionally, Energomontaż-Południe performs works on low- and medium-pressure pipelines in the engine room as well as assembles the flue gas and air ducts. |
***
***
Assembly of the pressure part for the new 912 MW power unit at the Rheinhafen Dampfkraftwerk 8 Power Plant |
|
The scope of works performed by the Company cover welding works and hoisting of ca. 6.5 tons of the following components:
|
***
***
Modernisation of the Department of Coal Derivatives Production at the "Przyjaźń" Sp. z o.o. Coking Plant in the scope of delivery, assembly, preparation of anticorrosive protection, insulation and start-up of the following units (ca. 1900 tons): | |
|
***
***
Modernisation of the BB-1150 type K-3 boiler at the Bełchatów Power Plant: | |
|
***
Modernisation of GAVO no. 2 at the flue gas desulphurisation system for the 225 MW power units at the Łaziska Power Plant in the scope of: | |
|