Year |
Client |
Scope of work |
2002 |
PKE SA ŁAZISKA POWER PLANT SA |
Repair of turbine set TG 10, 225 MW - exchange of large-size fittings - dampers, compensators ø> 2m, delivery and assembly of by-pass of main steam dampers |
2001-2002 |
BYDGOSZCZ HEAT AND POWER GENERATING PLANT |
Installation of 1K35 turbine set (Alstom Power) and auxilliares |
2001 |
ŁAZISKA POWER PLANT SA |
Repair of turbine set TG 12 225 MW |
2001 |
ŁAZISKA POWER PLANT SA |
Modernization of turbine set TK 225 for unit No.11 |
2000 |
SEJ ZOFIÓWKA HEAT AND POWER GENERATING PLANT |
General overhaul of turbine set TC 32 |
1999-2000 |
SZCZECIN POWER PLANT SA |
Installation of steam turbine set 4UCK 65 (Alstom Power) |
1999-2000 |
BĘDZIN HEAT AND POWER GENERATING PLANT |
Turn-key installation of 13 UCK 80 turbine set (Alstom Power) |
1999-2000 |
NOWA SARZYNA HEAT AND POWER GENERATING PLANT |
Installation of two gas turbines, N = 40 MW (Thomassen International) |
1999 |
ŁAZISKA POWER PLANT SA |
Complete overhaul of steam TG-2 turbine |
1999 |
ŁAZISKA POWER PLANT SA |
Modernisation of 13K200 turbine of power unit No.12 |
1998 |
JAWORZNO III POWER PLANT SA |
Installation of 13 CK 70 turbine (ABB Zamech) |
1997 |
ZEC MIECHOWICE |
Overhaul and modernisation of Alstom turbine, N = 55 MW |
1997 |
MARCEL COAL MINE |
Overhaul of CKD Blansko turbine, N = 22 MW |
1997 |
JAWORZNO III POWER PLANT SA |
Installation of 13 CK 70 turbine (ABB Zamech) |
1996 |
MARCEL COAL MINE |
Overhaul of AEG turbine, N = 15 MW |
1996 |
ZOFIÓWKA HEAT AND POWER GENERATING PLANT |
Complete overhaul of TG 32 turbine |
1995 |
BYTOM HEAT AND POWER GENERATING PLANT |
Installation of 7UC60 turbine |
1995 |
KĘDZIERZYN CHEMICAL WORKS |
Overhaul and installation of MAN GHH turbines:
- steam turbine, TRe 6/10, N = 4780 KW
- gas turbine, GTAn 8/90.2, N = 6140 KW |
1995 |
TARNÓW CHEMICAL WORKS |
Overhaul of LANG turbine, N = 24 MW |