 Year Client Scope of work
2005 DESALINATION PLANT "DĘBIEŃSKO" CZERWIONKA - LESZCZYNY Replacement and insulation of technological pipes (acid-resisting steel, ø > 1000 mm)
2005 PORĄBKA-ŻAR HYDRO-ELECTRIC POWER PLANT SA Replacement of run-off cooling water pipelines of unit transformers and replacement of seal at suck pipes flaps
2005 ZUREC BĘDZIN SP. Z O.O. Manufacture of gaseous-line No. 6 elements for corps frame of chamber agitator
2005 SEJ S.A. PNIÓWEK HEAT AN POWER GENERATING PLANT Rebuilding of pipelines linking AKM and SKM refrigerating units
2005 DOLNA ODRA POWER PLANTS Delivery and assembly of high and medium pressure pipelines of unit No. 8 for Alstom Power
2003-2004 HEAT AND POWER GENERATING PLANT ZOFIÓWKA SA Delivery and assembly of live steam piping Ø 219 mm, Ø 159 mm
2003 HEAT AND POWER GENERATING PLANTS - ŁÓDŹ EC2 Modernization of piping of heat generating turboset pipline TZ-7
2003 PHS SA CEDLER STEEL MILL Renovation of water pipeline (L= 400 m, Ø 490 mm), and assembly of natural gas pipeline (L= 150 m, Ø 200 mm)
2003 HEAT AND POWER GENERATING PLANT ZOFIÓWKA SA Modernization of high pressure regeneration heaters' cooling system PWU 150 and PWU 200
2003 GLIMAR REFINERY GORLICE Prefabrication and assembly of Hydrokomplex piping system
2003 THE CITY OF TYCHY Exchange of section of heat generating set in the Tychy
2003 OKOCIM BREWERY BRZESKO Assembly of pipelines for heating water Ø 219 mm, demineralizated waterØ 108 mm and ammonia Ø 139 mm, Ø 50mm
2003 PKE SA ŁAZISKA POWER PLANT Renovation of primary, live and feeding steam pipelines of turbo set No 9
2003 PĄTNÓW POWER PLANT SA Delivery of complete piping for turbine house of power unit A 460 MW (including P-91 grade)
2002-2003 TURÓW POWER PLANT SA Manufacturing and delivery of complete piping for turbine house of power units No. 4 and 6
2002-2003 PKE SA ŁAZISKA POWER PLANT SA Modernization of large-size fittings and repair of low-pressure regeneration turbo sets TK-120 and TK-230
2002-2003 EEG SUSZEC Assembly of heating pipings housing estate
2002 MARICA POWER PLANT (BULGARIA) Delivery of pipelines elements and turbine fittings 125MW
2002 RZESZÓW HEAT AND POWER GENERATING PLANT SA Assembly of main steam pipelines (material P91)of steam-gas power unit 100 MW
2002 PKE SA JAWORZNO POWER PLANT Delivery of high- and low-pressure pipelines within turbine 220MW No. 5