References

   Page 11 of 22   

 Year Client Scope of work
2002-2003 ZDZIESZOWICE COKE PLANT SA Erection of conveyor station No. 4
2002 DEMAG WARSZAWA Manufacturing of steel structures of overhead cranes: ZKK-M-007 22400mm1pcs.; PRC-HT 28000mm 2 pcs.; ZKK-M-009 7800mm 2pcs.; EKK-S-001 19350mm 1pcs.; ZKK-M-004 8550mm 2pcs.; ZKK-M-003 30400mm 2pcs.; PRC-M-005 27500mm 2pcs.
2000 ŁAZISKA POWER PLANT SA Repair of overhead crane rail
2000 KATOWICE STEEL MILL SA Manufacture and assembly of conveyor of skew brodge 90 m - installation of concrete mixing
1999 ŁAZISKA POWER PLANT SA Modernisation of crane equipment subgrades
1998 ŁAZISKA POWER PLANT SA Overhaul of overhead crane subgrade of 200 MW power blocks along with rectification
1997 SEJ SA ZOFIÓWKA HEAT AND POWER GENERATING PLANT Installation of overhead crane (Q=5t) in workshop
1996 SEJ SA MOSZCZENICA HEAT AND POWER GENERATING PLANT Disassembly of overhead crane in coalyard
1996 SEJ SA MOSZCZENICA HEAT AND POWER GENERATING PLANT Repair of bridge no. 20 according to specification
1995 ŁAZISKA POWER PLANT SA Overhaul of TWO32 overhead craneScope of work: disassembly, prefabrication and assembly of overhead crane beam, dynamic and static tests and preparation of documentation
1995 ŁAZISKA POWER PLANT Repair of overhead crane (Q=125 KN)
1995 "JAS-MOS" JASTRZĘBIE COAL MINE Disassembly and assembly of two bridge spans along with their adaptation according to specification
1995 "JAS-MOS" JASTRZĘBIE COAL MINE Modification of coaling bridge steelworks
1995 ŁAZISKA POWER PLANT Overhaul of crane track at cooling water pumping stationScope of work: preparation of technical documentation, construction, anticorrosion work and repair of steelwork
1995 ŁAZISKA POWER PLANT Assembly of rope winch (Q=20 KN) in No. III tower at a height of + 34.0 m
1995 MOSZCZENICA COAL MINE Disassembly and assembly of P3 bridge P3 along with modification of steelwork of two spans and anticorrosion work
2006 "PRZYJAŹŃ" COKE PLANT Delivery and assembly of steel construction for coke battery no. 5
2006 PKE SA JAWORZNO POWER PLANT Repair of machinery hall's supporting construction
2006 POLISH TECHNICAL GROUP KATOWICE Manufacture of chute head steel structure
2006 DEMAG CRANES WARSZAWA Steel structure of beams and staging