PKE SA ŁAZISKA POWER PLANT

Publish date: 06.29.2009


Repair of OP-380 boiler No. 2 and OP-650 boiler No. 11capital overhaul of OP-650 boiler No. 9
Repair of OP-380 boiler No. 2 and OP-650 boiler No. 11,capital overhaul of OP-650 boiler No. 9